இன்டர்நேஷனல் ஜர்னல் ஆஃப் அப்ளைடு சயின்ஸ் - ரிசர்ச் அண்ட் ரிவியூ திறந்த அணுகல்

சுருக்கம்

Optimizing Bicriteria in Flow Shop Production Schedule With String of Disjoint Job Block Criteria

Sameer Sharma

A bicriteria two stage flow shop scheduling is addressed to minimize the makespan and the rental cost of the machines under specified rental policy simultaneously. The processing times, independent setup times of the jobs are associated with their respective probabilities. Further the jobs are processed in a string of disjoint job-blocks. The study gives an optimal schedule rule to optimize the bicriteria through heuristic approach. The two criteria of minimizing the maximum utilization of the machines or rental cost and minimizing the maximum makespan are one of the combinations of our objective function reflecting the performance measure. A computer programme followed by a numerical illustration is given to substantiate the algorithm.

இந்தப் பக்கத்தைப் பகிரவும்